Pages

5/19/2026

"Free" GM Resource: Level 6/7 BX Adventure

"Free" GM Resource: Level 7/8 BX Adventure
OK, I know that I usually post a Free GM Resource and technically this is not free, but Pay-What-You-Want.

Hear me out though.....

How often do you come across a higher-level BX Adventure? Like...never, or at least that is my experience.

The God Towers of the Elophant is available as a PWYW adventure over at DTRPG. The links will take you there and should be associated with the author's affiliate link, not mine.....changing that would be a bit of a d**k move, IMNSHO.

Now if you want, you can head on over to the author's discourse website, The Cauldron. I'm not used to this type of site, and it felt weird to me trying to poke about, so I didn't too much.

**********

I did download and look at this adventure, and it's not an adventure in the traditional sense, but a large underground location inhabited by two disparate groups that mostly co-exist, but there will inevitably be some big conflict that the party should be present for. To me it felt like a much longer version of my "Tweak & Toss" Adventure Seeds.

I like it, but I can see  lot of GMs being disappointed if they had different expectations. I think I'll use it sometime, if that's saying anything....

0 comments :

Post a Comment